好职校,职校招生和学历提升信息网。

分站导航

热点关注

择校网在线报名

在线咨询

8:00-22:00

当前位置:

择校网

>

职校资讯

>

招生百科

船期英语 船期用英语怎么说

来源:择校网   时间:2024-11-30 13:32:47

一、船期英文怎么说

问题一:船期4/6用英文该怎么说 Sailing date is June 4.

Sailing date is April 6.

两种可能。

问题二:船期大概42天左右英语怎么说船期大概42天左右

The time schedule for about 42 days

船期大概42天左右

The time schedule for about 42 days

问题三:船期,航程,堆场用英语怎么说?船期 shipping schedule, shipping date

航程 voyage

堆场 storage yard/stack yard

Please inform us the shipping schedule, voyage and户osition of the stack yard.

问题四:船期是否满足英语怎么说?”船期是否满足“可以有两种解释:

1.货物到达的时间是否会晚?―― Will the shipment be on time?

2.几趟船运够不够?―― Will the arranged shipments be enough for the order矗

你问的是哪一种呢?

问题五:各位大虾,船期用英语怎么说 shipping window

问题六:我们会订最近的船期的英文怎么说 10分 We will make booking according the latest container ship

问题七:英文怎么说我们被告知由于3/1的船期停航,所以船期不得不延期到3/5 We were told that the shipping date would have to be delayed/

postponed until Mar. 5th due to suspending of the ship dated Mar. 1st.

【英语牛人团】五年外贸精英人士倾情奉献,可追问,满意请记得采纳哦,谢谢啦!

二、船期用英语怎么说

问题一:船期大概42天左右英语怎么说船期大概42天左右

The time schedule for about 42 days

船期大概42天左右

The time schedule for about 42 days

问题二:船期4/6用英文该怎么说 Sailing date is June 4.

Sailing date is April 6.

两种可能。

问题三:船期是否满足英语怎么说?”船期是否满足“可以有两种解释:

1.货物到达的时间是否会晚?―― Will the shipment be on time?

2.几趟船运够不够?―― Will the arranged shipments be enough for the order矗

你问的是哪一种呢?

问题四:各位大虾,船期用英语怎么说 shipping window

问题五:船期,航程,堆场用英语怎么说?船期 shipping schedule, shipping date

航程 voyage

堆场 storage yard/stack yard

Please inform us the shipping schedule, voyage and户osition of the stack yard.

问题六:英文怎么说我们被告知由于3/1的船期停航,所以船期不得不延期到3/5 We were told that the shipping date would have to be delayed/

postponed until Mar. 5th due to suspending of the ship dated Mar. 1st.

【英语牛人团】五年外贸精英人士倾情奉献,可追问,满意请记得采纳哦,谢谢啦!

问题七:我们会订最近的船期的英文怎么说 10分 We will make booking according the latest container ship

三、货代常用英语句子

货代常用英语句子

大家知道货代会常用到哪些英语句子呢?以下是由我为大家整理的关于货代常用英语句子,希望能给大家带来帮助。

货代常用英语句子

1、货物将于XX时间完成?货物将于XXX(时间)完成。

When will the cargo be ready? Cargo will be ready at XXX(Jan.28th).

2、仓位紧张,请尽快确认

Please confirm soonest as possible due to tight space

3、船公司回复——没有仓位

There is no space based on the reply of shipping lines

4、几票货物(几家工厂)合拼一个柜子发运

Shipment would be effected by several factories

5、几个订单合并一起出运

Those orders would be combined into one shipment

6、截港时间 Cut off date

7、截单时间 documentary off date

8、开仓时间(开始放箱的时间)Empty pick up date(Empty release time)

9、预留仓位 Pre-booking space

10、船期调整 Adjustment of shipping schedule

(因船公司调整船期,所以原计划X月X日船,XXX提单号项下货物,调整至。)

(Due to adjustment of shipping schedule, shipment under B/L NO.:….that carried by VES… ETD on…. Would be arranged on…

11、客户已于XX时候装箱/提箱

Cargo had been stuffed on….(Container had been picked up on..)

12、客户无法赶上本航次,要求推至下一航次

As requested by customer, cargo can not catch this voyage and will be postponed to next voyage

13、已向船公司订舱,但未确认仓位

Booking had been ordered with shipping lines however not receive the confirmation yet.

14、放箱 Empty Release

15、客人出差 Customer is on his business way

16、仓位 Space

17、增加/减少1个柜子 add/reduce one volume

18、客户想要通过拼箱的.方式出运剩下的货物

Customer intend to ship remains cargo by LCL

19、最新情况 the latest status

20、没有新消息 no any news(no any further information)

21、此1x20’G是下面所说货物中的一部分.

Said 1X20GP is part of below-mentioned shipment

22、现在还没开始放仓。Empty Pick-up is not started yet.

23、发货人安排明日装货Cargo would be stuffed tomorrow arranged by shipper

24、发货人急要入货通知。Shipper eager to get the shipping order(S/O)

25、此票货物申请推迟航次 This shipment would be postponed to next voyage

26、此票货物赶不上这个航次 This shipment can not catch this voyage

27、事情还没有解决。It is not solved until now

28、这票货物是继续走ZIM还是换船公司?

Does this shipment keep on carrying by ZIM LINE or by other shipping lines?

29、不知道客户是否能接受MSC?

We are not sure if the customer will accept MSC as carrying line

30、此票货物分单还没电放,请不要放货给收货人

Original House Bill of lading for this shipment is not surrendered yet, please do not release the cargo to consignee

31、此票货物签单方式是电放,客户尚未同意电放,请勿放货

Shipment would be released against telex release, shipper has not presented us the application for telex release, please hold the shipment until our further notice.

32、每个柜子重22TONS

Gross weight is 22tons per containers

33、发货人不同意少显示重量

Shipper did not agree to show less weight for this shipment

34、我们把这个仓位给了另外的客户使用。

Space(allocation) had been assigned to another customer.

35、发货人在等收货人确认是否出运

Shipper is waiting for consignee’s confirmation for shipping

36、此票货物包含订单号为X和订单号 Y的货物。

This shipment included the cargo under Order X and Y.

37、此票货物与JOB NO: X& Y的货物货物一起出运,我们选择JOB#X作为主号

Said cargo would be combined with JOB NO.ABCDE and, JOB#A would be the final JOB#.

38、我们正在向船东申请,将柜型由1X40H调整为1x20‘G.

We are applying with shipping line for amendment of container size from 1X40HQ into1X20GP.

39、所有小柜毛重不超过17.9TONS

The gross weight for all the 20GP is not more than 17.9TONS

40、我们提前定了EMC的仓位,约号XXXXXX.

We had ordered the booking with EMC in advance under SQM780184…..

41、这些货物中的1X40’H取消了。

1X40HQ had been cancelled from this shipment.

42、明天开始放仓,不确定能否有仓位。。

Shipping order will be confirmed tomorrow by shipping lines, we are not sure if the space could be secured now.

43、上述订舱可以继续进行吗?

Does the above-mentioned booking can keep on proceeding?

44、 L.T. Local Time当地时间

45、 damaged goods损坏了的货物

;

关于船期英语和船期用英语怎么说的介绍到此就结束了,不知道你从中找到你需要的信息了吗 ?如果你还想了解更多这方面的信息,记得收藏关注本站。

标签:      

2024年招生 在线咨询
本站覆盖全国各省市中高职专本科院校及计划外招生院校,汇总各校招生要求及专业信息,如您今年尚未被任何院校录取,请自愿填写下表,我们将在全国范围内筛选适合您就读的大学,安排招生老师与您沟通。即刻报名,圆大学梦!
*

学生姓名

*

手机号码

*

户籍地址

*

当前学历

 

意向专业

立即提交 《隐私保障》

分享:

qq好友分享 QQ空间分享 新浪微博分享 微信分享 更多分享方式
(c)2024 www.chinazhenyi.com All Rights Reserved SiteMap 联系我们 | 陕ICP备2023010308号-3